Board of Building Standards/Architectural Board of Review/Sign Review Board

About the BBS/ABR/Sign Review Board

The Architectural Board of Review (ABR) serves to “protect the value, appearance and use of property on which buildings are constructed or altered, to maintain a high character of community development, to protect the public health, safety, convenience and welfare and to protect real estate within the City from impairment or destruction of value.”

The City Charter and Code provides the Board the authority to review:

  • New construction and renovation work on existing buildings which alters exterior elevations, including the painting/treatment of previously unaltered masonry (per Chapter 1325).
  • Sign proposals (per Chapter 1329).
  • Appeals to building code decisions by the Building Commissioner (per Charter Article 7.4).

The Board has broad review authority, but typically limits its purview on new construction and renovations to those proposals that are visible from the public right-of-way.  Within each proposal, the Board’s authority encompasses the design, use of materials, finished grade lines, dimensions, orientation and location of all main and accessory buildings to be erected, moved, altered, remodeled, or repaired.

In reviewing proposals, the Board uses:

  • Accepted and recognized professional architectural principles.
  • City Design Guidelines and Standards
  • The development of adjacent, contiguous, and neighboring buildings and properties for the purpose of achieving safe, harmonious, and integrated development of related properties.

Please Read Before Submitting A Proposal:

  • New construction or renovation projects that are visible from the public right-of-way and/or commercial signs must obtain approval from the ABR/Sign Review Board prior to obtaining permits from the Building Department.
  • It is recommended that projects requiring ABR/Sign Review obtain that approval before submitting for Building Department plan review/permitting. This is to avoid having to resubmit new plans to the Building Department should any design changes occur during the ABR/Sign Review process. 
  • Additionally, if the project requires a conditional use approval from the Planning Commission (PC) or a variance from the Board of Zoning Appeals (BZA), those should be obtained before beginning ABR/Sign Review.
  • Please review the documentation needed when submitting for the Sign Review Board below.

Applicants are highly encouraged to discuss their proposal with Planning & Development prior to applying for Commission review.  An initial discussion can help clarify what approvals are required and streamline the best path forward. Direct all questions and/or requests to schedule a meeting with Planning and Development staff to planning@lakewoodoh.gov or by calling (216) 529-6630.

How to Submit A Proposal to the ABR and/or Sign Review Board

Step 1: Prepare

In preparing your proposal, it is important to understand existing City guidelines (front porch, commercial districts, outdoor dining, etc.) and for sign proposals – what is permitted and not permitted under the City sign regulations (Chapter 1329).

As you prepare your proposal, click here to view the meeting calendar and anticipate the best month to submit your application once you have all the required documents to support review.

Architectural Review Proposals (New Construction/Renovation) should include the following:

  • A Scaled Site Plan that details elements of the proposal and depicts adjacent properties/uses.
  • Photos of Existing Conditions that documents the current state of the property/project area.
  • Design documents including scaled elevations, sections, and perspectives of proposal.
  • Intended Materials including example photos and/or material manufacturer’s cut sheets.

Sign Proposals should include the following:

  • Scaled Site Plan that details elements of the proposal and depicts adjacent properties/uses.
  • Photos of Existing Conditions that documents the current state of the property/project area.
  • Design documents including dimensions of all proposed sign elements and building elevations that show the exact placement of each sign.
  • Intended materials for each sign element including examples photos and/or material manufacturer’s cut sheets.
  • Information on sign illumination (if proposed)

Step 2: Apply

Complete your application for review using our CitizenServe portal. All applications are submitted online.

Once in CitizenServe, click on the “apply to Architectural Board of Review” and complete the online application which includes attaching your supporting files (site plan, photos, design documents, and intended materials). If this is your first time using the portal, you’ll need to quickly register first.

Proposal Name and Address

Once you are on the application, provide a brief description/name for the proposal and the property address. Of note, property addresses within CitizenServe are those associated with the County parcel/property records. Sometimes, in order to enter an address for a storefront or other location that has multiple addresses within a single building, the applicant will need to use the County property website to locate the primary address associated with their building’s parcel.

Proposal Type

Once the address is entered, the applicant should be able to choose which category their application falls under:

  • Commercial – Building
  • Commercial – Sign
  • Residential

For commercial building applications that also include signage, the applicant will need to submit two separate applications (one for ABR covering the building improvements and one for Sign Review).

To ensure your application is complete, please upload all required elements for the proposal before submitting the application.

Step 3: Present and Discuss

Once your application has been submitted, you will receive an email with information on the meeting dates/times and recommendations (if any) to help ensure your proposal is appropriately prepared for Board review.

Pre-Review Meeting (Not Required to Attend)

The Board conducts a pre-review meeting on the first Thursday of each month. Not every applicant is required to attend the pre-review meeting, which is typically reserved for more complex or larger scale/scope proposals.

Formal Review Meeting (Applicant Must Attend)

The formal review meeting is held the second Thursday of each month. Each applicant must plan on attending this meeting in person for the proposal to be heard/discussed.

For new construction and proposals of larger scale/scope, it may take more than one meeting for the Board to fully consider the proposal. Given their consideration of architectural principles and City guidelines/standards – the adjacent and neighboring buildings provide important context for applicants to understand and reference as part of their proposal (for the purpose of achieving harmonious and integrated development).

Applicants may be required to update and submit new plans. This enables a more efficient approval process and transition of the approved plan to the Building Department’s plan review/permitting process.

Step 4: Building Plan Review and Permit Acquisition

Once approval is obtained from the ABR/Sign Review Board, applicants can then complete the building code plan review and obtain construction and/or installation permits from the Department of Building and Housing.

If the proposal still requires a conditional use or variance approval, that also must be obtained before permits will be issued.

Signage Submittal Requirements

Applicants to the Sign Review Board must provide:

  • Material details
  • Dimensions (show overall size of the actual sign and sign banner area)
  • Dimensions of the storefront to calculate allowance
  • Dimensions of windows if including vinyl window signage (Allowed 15% of window square footage)
  • Provide scaled elevations showing distance to grade, projection, and height. (Minimum height above grade for sidewalks is 8’ and 16’ above pavement for vehicular traffic per LCO §1329.05(1))
  • Attachment/anchorage details (cannot be attached to unbraced parapet walls)
  • Electrical details (cross-sections, grounding, and bonding)

Any required documentation not included in your application could necessitate a deferral to the next month’s meeting.

 
Signs not needed to be seen by the Sign Review Board:
  • Signs less than 3 sq. ft. in area
  • Retrofit/replacement of existing signs – no change in size, location, or design
  • Re-covering of awnings
  • Temporary signs (banner type only)

ABR/BBS/SRB Meeting Schedule

Review MonthApplication DeadlinePre-Review MeetingReview Meeting
JanuaryWednesday, 12/17/20251/1/20261/9/2026
FebruaryWednesday, 1/21/20262/5/20262/12/2026
MarchWednesday, 2/18/20263/5/20263/12/2026
AprilWednesday, 3/18/20264/2/20264/9/2026
MayWednesday, 4/22/20265/7/20265/14/2026
JuneWednesday, 5/20/20266/4/20266/11/2026
JulyWednesday, 6/17/20267/2/20267/9/2026
AugustWednesday, 7/22/20268/6/20268/13/2026
SeptemberWednesday, 8/19/20269/3/20269/10/2026
OctoberWednesday, 9/16/202610/1/202610/8/2026
NovemberWednesday, 10/21/202611/5/202611/12/2026
DecemberWednesday, 11/18/202612/3/202612/11/2026
January12/23/20261/7/20271/14/2027
January
Application Deadline:Pre-Review Meeting:Review Meeting:
12/17/20251/1/20261/8/2026
Application Deadline: Pre-Review Meeting: Review Meeting:
1/21/2026 2/5/2026 2/12/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
2/18/20263/5/20263/12/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
3/18/20264/2/20264/9/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
4/22/20265/7/20265/14/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
5/20/20266/4/20266/11/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
6/17/20267/2/20267/9/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
7/22/20268/6/20268/13/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
8/19/20269/3/20269/10/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
9/16/202610/1/202610/8/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
10/21/202611/5/202611/12/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
11/18/202612/3/202612/11/2026
Application Deadline:Pre-Review Meeting:Review Meeting:
12/26/20261/7/20271/14/2027