Inspections and Code Compliance

Overview

The City of Lakewood Housing and Building Department performs inspections to ensure code compliance and to prevent building and safety issues from arising. These inspections include:

  • Periodic inspections of commercial and residential rental properties;
  • Inspections on residential and commercial renovations, additions, and new builds;
  • Inspections during the ownership transfer of commercial and residential rental properties.

Certificate of Code Compliance

Effective September 1, 2019, certificates of code compliance, formerly known as certificates of occupancy, are required for new and changes of retail tenancies and before the sale of all non-owner-occupied residential rental properties. The rules are outlined in LCO §1173.01, LCO §1306.53.)

Inspections – formally known as point-of-sale inspections – are required before these certificates may be issued. These inspections include the interior of a commercial space and the interior, exterior and yard areas of residential rental properties. 

To request an inspection, visit our Citizen Serve portal to fill out an online form or download and fill out the Request for Certificate of Code Compliance form.

Please contact the Division of Housing and Building at building.permits@lakewoodoh.gov or (216) 529-6270 to learn how to submit your request and schedule an inspection.

What Inspections Does My Project Need?

The accordion below lists the inspections needed for each type of permit. To schedule an inspection, contact the Division of Housing and Building at building.permits@lakewoodoh.gov or (216) 529-6270.

Footer

  • Pre-Pour

Foundation

  • Anchors/Brick Ties
  • Parge/Tar
  • Storm Connections

Framing

  • Rough-In
  • Insulation/Fire Protection
  • Final

Plumbing

  • Underground
  • Rough-In
  • Final

Electrical

  • Underground
  • Rough-In
  • Final

HVAC

  • Rough-In
  • Final

Other

  • Plot Check

Electrical

  • Final

HVAC

  • Rough-In
  • Final

Concrete/Paving

  • Final

Framing

  • Rough-In
  • Insulation/Fire Protection
  • Final

Plumbing

  • Rough-In
  • Final

Electrical

  • Rough-In
  • Final

HVAC

  • Rough-In
  • Final

Framing

  • Rough-In
  • Insulation/Fire Protection
  • Final

Plumbing

  • Rough-In
  • Final

Electrical

  • Rough-In
  • Final

HVAC

  • Final

HVAC

  • Final

Concrete/Paving

  • Pre-Pour
  • Final

Footer

  • Pre-Pour

Framing

  • Rough-In
  • Final

Electrical

  • Underground
  • Rough-In
  • Final

Other

  • Plot Check

Plumbing

  • Underground
  • Rough-In
  • Final

Electrical

  • Underground
  • Final

Electrical

  • Underground
  • Rough-In
  • Final

HVAC

  • Final

Electrical

  • Rough-In
  • Final

HVAC

  • Rough-In
  • Final

Other

  • Final

Framing

  • Rough-In
  • Insulation/Fire Protection
  • Final

Plumbing

  • Underground
  • Rough-In
  • Final

Electrical

  • Underground
  • Rough-In
  • Final

HVAC

  • Rough-In
  • Final

Electrical

  • Final

HVAC

  • Rough-In
  • Final

Footer

  • Pre-Pour

Foundation

  • Anchors/Brick Ties
  • Storm Connections

Framing

  • Rough-In
  • Insulation/Fire Protection
  • Final

Plumbing

  • Underground

Electrical

  • Underground

Concrete/Paving

  • Pre-Pour
  • Final

Plumbing

  • Underground
  • Rough-In
  • Final

Plumbing

  • Final

Framing

  • Rough-In
  • Insulation/Fire Protection
  • Final

Plumbing

  • Rough-In
  • Final

Electrical

  • Rough-In
  • Final

HVAC

  • Final

Footer

  • Pre-Pour

Plumbing

  • Final

Other

  • Final

Other

  • Final

Electrical

  • Underground
  • Rough-In
  • Final

Plumbing

  • Underground
  • Rough-In
  • Final

Electrical

  • Underground
  • Rough-In
  • Final

Other

  • Plot Check

Plumbing

  • Underground
  • Rough-In
  • Final

Foundation

  • Parge/Tar
  • Storm Connections

Foundation

  • Storm Connections

Plumbing

  • Underground

Electrical

  • Final

Concrete/Paving

  • Pre-Pour
  • Final

Other

  • Vapor Barrier/Shield